Search for: "ENVIRONMENTAL DESIGN & CONSTRUCTION, LLC" Results 1 - 20 of 270
Sorted by Relevance | Sort by Date
RSS Subscribe: 20 results | 100 results
3 Mar 2014, 8:42 am
A final Request for Proposals will be issued this summer after federal officials grant environmental approval. [read post]
20 Jul 2016, 7:51 am by Steven Koprince
 Insight’s majority owner was Insight Environmental, Engineering & Construction, Inc.; the minority owner was Environmental Chemical Construction. [read post]
19 Mar 2015, 1:01 pm by Fred Kessler
Roadway Electric LLC Andes Engineering Dibble Engineering DME Consultants, LLC Geomatic Consulting Group J2 Engineering & Environmental Design, LLC Lee Engineering, LLC Michael Baker Jr., Inc. [read post]
28 Jul 2015, 5:54 am by Nathaniel Boesch
Department of Energy (DOE) recently released a Draft Environmental Impact Statement (DEIS) for Northern Pass Transmission, LLC’s proposed 187-mile transmission line across the United States-Canada border in New Hampshire. [read post]
25 Apr 2011, 5:11 am by Alan Ackerman
McCanna Hills, LLC, a subdivision developer in Riverside, California, is suing Riverside County because of a huge change in road construction plans. [read post]
14 Nov 2018, 1:31 pm by Eversheds Sutherland
FERC Staff has released a draft environmental impact statement (EIS) for the Plaquemines LNG and Gator Express Pipeline Project proposed by Venture Global Plaquemines LNG, LLC and Venture Global Gator Express, LLC (collectively called Venture Global). [read post]
18 Dec 2012, 9:41 am by Tristan Robinson
On December 17, 2012, the Board of the New York State Thruway Authority (“NYSTA”) unanimously approved award of the design-build contract for the Tappan Zee bridge replacement project to Tappan Zee Constructors, LLC (a consortium of Fluor Enterprises, Inc., American Bridge Company, Granite Construction Northeast, Inc., and Traylor Bros., Inc.). [read post]
25 Aug 2019, 10:48 am by Patricia Salkin
Petitioner next argued that the Commission did not adequately consider that existing residents needed protection from construction and loading-dock nuisances such as noise, refuse, odors, emissions, and other environmental impacts. [read post]
5 May 2017, 11:37 am by Patricia Salkin
Wooster v Queen City Landing, LLC 2017 WL 1822611 (NYAD 4 Dept. 5/5/017)Filed under: Current Caselaw - New York, Environmental Review [read post]
6 May 2015, 8:57 am by WIMS
<> Building for the Future: A New Federal Guide to Infrastructure Planning and Design - On May 5, the White House  convened the nation's leading thinkers on infrastructure planning and design to highlight how projects like new roads and transit lines can be designed to foster economic opportunity and increase resilience to the impacts of climate change. [read post]
7 Sep 2016, 8:40 am by Law Offices of Jeffrey S. Glassman
Foster Wheeler, LLC – Proof of Asbestos Defendants’ Products as Proximate Cause of Injury, July 5, 2016, Boston Mesothelioma Lawyer Blog The post UMass Boston Construction Project Delayed by Asbestos Discovery appeared first on Mesothelioma Lawyers Blog. [read post]
7 Sep 2016, 8:40 am by Law Offices of Jeffrey S. Glassman
Foster Wheeler, LLC – Proof of Asbestos Defendants’ Products as Proximate Cause of Injury, July 5, 2016, Boston Mesothelioma Lawyer Blog The post UMass Boston Construction Project Delayed by Asbestos Discovery appeared first on Mesothelioma Lawyers Blog. [read post]
7 Jul 2009, 11:32 am
A majority of the site has been designated as Prime Agricultural land under ALISH. [read post]
25 Apr 2018, 7:56 pm by Susan Schneider
Wimberly worked on design, construction management, and operations of agricultural processing facilities; technical, economic, logistical, and environmental assessments of proposed/existing projects; and various business start-ups. [read post]
16 Mar 2020, 12:03 pm by Christopher G. Hill
She is the founder of EcoVision LLC, a solutions-based research and consulting firm, grounded in sustainable design practices, environmental stewardship, and building science. [read post]
1 Dec 2016, 7:19 am by Court C. VanTassell
In an April 15, 2016 Order, FERC authorized Magnolia LNG, LLC to site, construct, and operate a new LNG terminal and liquefaction facility in Lake Charles, Louisiana designed to export 8 million metric tons of domestically-produced natural gas per annum, with a capacity equivalent to pipeline receipts of up to 1.4 billion standard cubic feet per day (Magnolia LNG Project). [read post]