Search for: "Electric Power Board" Results 221 - 240 of 1,715
Sorted by Relevance | Sort by Date
RSS Subscribe: 20 results | 100 results
25 Nov 2011, 5:00 am by Jon L. Gelman
The serious violations, with $84,000 in penalties, include failing to keep work areas and passageways free of litter; provide guardrail protection, guard machines and electrical boxes; provide an eyewash station; provide personal protective equipment for workers handling chemicals; provide industrial truck and hazardous communication training; ensure exit routes were unobstructed and visibly marked; make sure exit doors could open properly; cover electrical panel boards… [read post]
29 Feb 2016, 6:55 am by Joy Waltemath
Systems operators assign field personnel to address power outages and other problems; they monitor and control certain electrical systems, analyze outages, prioritize work assignments, and maintain records. [read post]
2 Sep 2011, 1:47 pm by Stephen Thorn
  Under the act, a renewable energy facility includes a generator attached to a building or parcel of land that is powered by solar energy or wind, dedicated crops grown for electricity generation, anaerobic digestion of livestock or food processing waste, fuel cells or microturbines powered by renewable fuel or hydroelectric energy. [read post]
28 Mar 2012, 1:49 pm by WIMS
Rizzo, M.D., Chair, Board of Directors of the American Lung Association said, "? [read post]
22 Apr 2012, 5:00 pm
The Ontario Labour Relations Board (OLRB) has ruled that a worker does not have to be a certified or apprentice electrician to interconnect solar panels using “plug-and-play” electrical connectors. [read post]
13 Oct 2010, 11:39 pm
The drop in electrical power occurred while maintenance work was underway on a terminal almost 40 miles from the explosion site. [read post]
5 Feb 2020, 3:02 am by Lynn Jokela
The proposal asks the company to end using coal-fired generation of electricity from a power plant it operates no later than the end of 2025 and to replace the electricity with non-carbon emitting renewable energy. [read post]
17 Jan 2011, 7:29 am by Alan Ackerman
The Kentucky State Board on Electric Generation Siting refused to consider the effect on farmers’ operations. [read post]
20 May 2007, 2:43 pm
In this regard, FERC operates more like the Nuclear Regulatory Commission (NRC) rather than the state PSC or siting board which authorizes approval for conventional electric power plants. [read post]
1 Mar 2010, 9:57 am by Lawyer Sanders
Friends of the Eel River (FOER) filed a lawsuit before the California State Water Resources Control Board (State Board), in an attempt to stop Pacific Gas and Electric Company (PG&E), from destroying two northern California rivers essential to the restoration of California’s once-vibrant billion dollar salmon industry. [read post]
10 Nov 2012, 1:01 pm by Deborah_ Bucknam
The Public Service Board’s statutory mandate includes facilitating renewable energy projects such as wind power. [read post]
1 Mar 2011, 10:22 am
The three directives, summarized below, sketch out Ontario's future mix of electricity generation technologies, identify some priority investments in transmission infrastructure, and require the Ontario Energy Board ("OEB") to expedite a hearing regarding the supply plan that the Ontario Power Authority ("OPA") will file later this year. [read post]
24 Jun 2011, 11:44 am by Gordon Craig
  The new bill significantly increases the renewable portfolio standard (RPS) applied to California electricity providers, requiring them to obtain 33% of their power from renewable sources by the end of 2020. [read post]
30 Jun 2021, 11:06 am by Senate Republicans
Bob Smith that will significantly increase the production of solar electricity in New Jersey cleared the Senate. [read post]
19 Apr 2008, 5:15 am
The court held that under Sterling an officer's presumptive powers were only rebutted when a formal board meeting was called and the officer acted contrary to the board's decision. [read post]
11 Aug 2011, 4:53 pm by Warren Brazier
Here are media reports from the Globe and Mail; Vancouver Sun; and Vancouver Sun editorial board. [read post]
12 Mar 2021, 7:14 am by Patricia Salkin
Upon review of the record, the court found that the County did not issue the second stop work order due to the electrical utility trenching a ditch to bury a power line on the property. [read post]
7 Aug 2009, 10:36 am
The load customer will pay for electricity, NCECs, and other volume-based charges based on its full consumption, regardless of whether the power is supplied from the grid or by the behind-the-meter generator. [read post]
8 Nov 2021, 8:11 am by Dan Bressler
‘The formula for the liquidated damages is common across the board.'” [read post]