Search for: "MW Equipment" Results 1 - 20 of 65
Sort by Relevance | Sort by Date
RSS Subscribe: 20 results | 100 results
6 May 2024, 4:43 am by INFORRM
Sir David Davis MP has tabled a number of far reaching amendments [pdf] to the  Strategic Litigation Against Public Participation Bill [pdf] which returns to the House of Commons for its Committee Stage on 8 May 2024. [read post]
19 Feb 2024, 7:00 am by Yosi Yahoudai
In fact, China put 38.4 gigawatts (38,400 MW) of new coal-fired power capacity into operation in 2020 alone – more than three times the amount built everywhere else around the world. [read post]
20 Nov 2023, 12:41 pm by Adam Schurle and Tori Roessler
Within this section, the Proposed Regulations also provide clarification regarding the 1 MW (AC) exception for claiming the 30% ITC. [read post]
20 Mar 2023, 9:36 am by Joel E. Meister
The PSC noted in its March order that it has pursued ambitious energy storage deployment goals, and that, after two rounds of utility solicitations, only 120 MW of storage projects have executed contracts against the initial 350 MW originally to be placed in service by the end of 2022. [read post]
11 Feb 2022, 1:52 pm by John McFarland
Reasons for power plant failures include “weather-related” issues (30,000 MW, ~167 units), “equipment issues” (5,600 MW, 146 units), “fuel limitations” (6,700 MW, 131 units), “transmission and substation outages” (1,900 MW, 18 units), and “frequency issues” (1,800 MW, 8 units). [read post]
18 Mar 2021, 1:41 pm by Jason Johns
  And that meant, in Broadview Solar’s case, that a solar power qualifying facility with greater than 80 MW of solar panel capacity, but only 80 MW of inverter capability, would not be eligible for qualifying facility status. [read post]
2 Mar 2021, 4:00 am by Deanne Sowter
The words “family violence”, “domestic violence”, “intimate partner violence” and “coercive control” do not appear anywhere in the Federation of Law Societies of Canada Model Code of Professional Conduct. [read post]
17 Jul 2020, 8:00 am by Jessica Bayles
Substantive changes in the QF recertification include changes in electrical generating equipment that increases power production capacity by the greater of 1 MW or 5% or a change in ownership in which an owner increases its equity interest by at least 10%. [read post]
23 Jan 2020, 2:07 pm by Michael Fitch
The FCC also provides that equipment authorized prior to the effective date of the Second R&O can continue to be marketed and used under their existing authorization so long as parties deploying such equipment ensure that equipment is installed consistently with the information in the installation manual or user instructions. [read post]
9 Jan 2020, 9:45 am by Peter Tannenwald
For example, if two 1 mW devices are intended to be used next to each other, they will be treated as a 2 mW device and will not be eligible for the 1 mW exemption. [read post]
9 Jan 2020, 9:45 am by Peter Tannenwald
For example, if two 1 mW devices are intended to be used next to each other, they will be treated as a 2 mW device and will not be eligible for the 1 mW exemption. [read post]
22 Feb 2018, 12:02 pm by Michael Fitch
A blanket exemption for single transmitter operations with up to 1 milliwatt (mW) available maximum time-averaged power independent of frequency and service; minimum two-centimeter separation between multiple transmitters operation at up to 1 mW. [read post]
5 May 2016, 2:15 am by Steve Brachmann
One working ARC reactor, which is what MIT calls its nuclear reactor design, could produce 200 megawatts (MW) of power delivered to the electric grid from a 50 MW input. [read post]
19 Aug 2015, 7:02 am by Laura Stefani
Licensed mics may only operate in 600 MHz at 20 mW EIRP in the Duplex Gap. [read post]
16 Jun 2015, 4:23 pm by Peter Tannenwald
The assumed power level for personal portable devices would be 40 mw, although the FCC asks whether it needs to accommodate 100 mw. [read post]
16 Jun 2015, 11:23 am by Peter Tannenwald
The assumed power level for personal portable devices would be 40 mw, although the FCC asks whether it needs to accommodate 100 mw. [read post]
4 Apr 2015, 5:57 am by Bill Marler
Product label for Chunky Spinach Artichoke & Parmesan Dip & Spread: Details on the first and second recalls below: After recently recalling its spinach dip sold in Bay Area Costco stores over Listeria concerns, La Terra Fina of Union City, CA, is expanding its recall to include additional spinach artichoke dip products: Recalled Products Product Description Item # UPC Code Best By Date Retailer Region Spinach Artichoke & Parmesan Dip made with Greek… [read post]