Search for: "Structural Steel Works, Inc." Results 21 - 40 of 128
Sorted by Relevance | Sort by Date
RSS Subscribe: 20 results | 100 results
22 Nov 2012, 4:45 am by John Hochfelder
Structure-Tone, Inc. (1st Dept. 2012), the all of the damages awards were affirmed. [read post]
31 Mar 2010, 9:33 pm by rohdec12
Our total installed development and construction costs for Steel Winds I were approximately $35 million, excluding prepaid turbine maintenance and warranty costs, and are financed by a combination of equity and structurally subordinated debt of CSSW, LLC. [read post]
15 Jan 2013, 7:37 am by Michael B. Stack
  During the demolition works an asbestos insulation board (AIB) covering a steel column was damaged, and a Wall Colmonoy employee was informed that they should tape a plastic bags around it. [read post]
20 Oct 2013, 8:45 pm by Ken White
Chowdhury's proposed final judgment would impose a sizable judgment against the whole Prenda team: It is hereby ORDRED, ADJUDGED AND DECREED that Defendant Chowdhury recover jointly and severally from Plaintiff AF Holdings, Inc., Prenda Law, Inc., John L. [read post]
15 Nov 2012, 8:14 am by David M. McLain
Inc. case, the Colorado Supreme Court held that the Economic Loss Rule barred the steel subcontractor’s negligence claims against the engineering firm and inspector for a public works project, even though the subcontractor had not directly contracted with the engineering firm or inspector. [read post]
25 Dec 2012, 10:48 am
In February 2009, plaintiff entered two subcontractor agreements with Big Poll whereby plaintiff agreed to perform the structural steel work, masonry, and concrete slabs on the Project. [read post]
28 Jul 2015, 11:14 am by Michael S. Levine
The Appellate Division of the Superior Court of New Jersey recently ruled in Cypress Point Condominium Association, Inc. v. [read post]
12 May 2006, 5:46 am
Working in small groups, the attendees quickly identified many of the critical issues in the structured settlement industry - the "untouchables" and "unchangables". [read post]
15 Apr 2007, 7:01 am
  The work to be performed provides for design and construction services for 74 family housing units and a community center, consisting of all necessary site clearing, grading, demolition, improvements, structures, and off-site work as required. [read post]