Search for: "General Electric Co. " Results 1321 - 1340 of 2,547
Sort by Relevance | Sort by Date
RSS Subscribe: 20 results | 100 results
6 Aug 2012, 6:49 am by D. Daxton White
(A3) as electric supplier guarantor; (ii) AMP Ohio (A1) as the participant; and (iii) Citigroup Inc. [read post]
6 Aug 2012, 6:49 am by D. Daxton White
(A3) as electric supplier guarantor; (ii) AMP Ohio (A1) as the participant; and (iii) Citigroup Inc. [read post]
5 Aug 2012, 12:54 pm by Steven Boutwell
Cleco is currently evaluating responses from its biomass RFP prior to submitting a proposal to the LPSC to pursue biomass co-firing at its Madison petroleum coke fired generation unit. [read post]
2 Aug 2012, 1:12 pm by NL
Ms H later left the flat and returned to find gas, water and electricity disconnected and fuses removed. [read post]
2 Aug 2012, 1:12 pm by NL
Ms H later left the flat and returned to find gas, water and electricity disconnected and fuses removed. [read post]
2 Aug 2012, 8:19 am by Glenn
The US sits back, lets the private sector innovate, and generally intervenes only when there has been a “market failure. [read post]
2 Aug 2012, 2:31 am by tekEditor
Parallel pipelines One reason that image processing is so computationally intensive is that it generally requires a succession of discrete operations. [read post]
1 Aug 2012, 8:34 pm by Ben Cheng
Circuit, “transmission line losses” reflect the costs of generating electricity rather than the costs of transmitting it.Certiorari stage documents:Opinion below (Pa. [read post]
1 Aug 2012, 1:29 pm by WIMS
Wind has installed 35% of all U.S. electric generating capacity, a close second to natural gas. [read post]
30 Jul 2012, 5:30 am by Matthew C. Bouchard, Esq.
The leading North Carolina case on these questions is Home Electric Co. of Lenoir, Inc. v. [read post]
28 Jul 2012, 8:08 pm by Rebecca Tushnet
Coleman Co., Inc, 93 U.S.P.Q.2d 2019, 2010 WL 766487 (T.T.A.B. 2010) (“Electric Candle” was a “unitary generic term”; the generic designation “company” added no trademark significance); In re Cell Therapeutics, Inc., 67 U.S.P.Q.2d 1795, 2003 WL 21979838 (T.T.A.B. 2003) (“Cell Therapeutics, Inc. [read post]
28 Jul 2012, 1:43 pm by WIMS
The study includes state-level maps and tables containing available land area (square kilometers), installed capacity (gigawatts), and electric generation (gigawatt-hours) for each technology. [read post]
28 Jul 2012, 12:52 pm by WIMS
The study includes state-level maps and tables containing available land area (square kilometers), installed capacity (gigawatts), and electric generation (gigawatt-hours) for each technology.NREL’s Anthony Lopez, a co-author of the study said, "Decision-makers using the study will get a sense of scale regarding the potential for renewables, and which technologies are worth examining. [read post]
28 Jul 2012, 8:20 am by WIMS
The study includes state-level maps and tables containing available land area (square kilometers), installed capacity (gigawatts), and electric generation (gigawatt-hours) for each technology. [read post]
27 Jul 2012, 1:07 pm by WIMS
The study includes state-level maps and tables containing available land area (square kilometers), installed capacity (gigawatts), and electric generation (gigawatt-hours) for each technology. [read post]
27 Jul 2012, 1:06 pm by WIMS
The study includes state-level maps and tables containing available land area (square kilometers), installed capacity (gigawatts), and electric generation (gigawatt-hours) for each technology. [read post]
27 Jul 2012, 1:04 pm by WIMS
The study includes state-level maps and tables containing available land area (square kilometers), installed capacity (gigawatts), and electric generation (gigawatt-hours) for each technology. [read post]
24 Jul 2012, 1:24 pm by Thomas G. Heintzman
Kent Services Ltd.19 The rule was effectively applied 100 years ago by the House of Lords in TW Thomas & Co. [read post]
21 Jul 2012, 2:46 pm
In certain respects, the FERC and BOEM legal regimes do not easily co-exist. [read post]