Search for: "C. Steele" Results 661 - 680 of 1,258
Sorted by Relevance | Sort by Date
RSS Subscribe: 20 results | 100 results
10 Jul 2011, 4:43 am by Lawrence B. Ebert
C-COR, Inc., 413 F.3d 1361, 1369 (Fed. [read post]
17 Mar 2011, 8:44 am by Maxwell Kennerly
The containment structure is a hermetically (air tight) sealed, very thick structure made of steel and concrete. [read post]
9 Nov 2008, 7:20 am
., were charged with conspiracies to interfere with commerce by robbery and to sell cocaine, and § 924(c)'s. [read post]
2 Apr 2018, 1:36 pm by Dan Flynn
“The presence of this dangerous bacteria at a cheese manufacturing facility in Upstate New York is of grave concern,” said Grant C. [read post]
8 Sep 2014, 3:12 pm by Nate Russell
In any event, while staring at a schedule to the Ontario Factories Amendment Act, 1889 SO 1889, c. 53 recently, I guess this other idea just hit me. [read post]
27 Aug 2008, 6:04 pm
State of Indiana , an 11-page opinion, Judge Najam writes:Gina Williams appeals her convictions for Forgery, a Class C felony, and Attempted Theft, as a Class D felony, following a bench trial. [read post]
2 May 2007, 9:20 am
The trial court thus erred in failing to deny the Steeles' appeal and dismiss the proceeding. [read post]
In finding the employee did not lose the protection of the Act when he raised concerns about the employees’ working conditions to the employer’s safety manager at a safety meeting, the Board adopted the judge’s application of the four-factor test set forth in Atlantic Steel. [read post]
6 Jan 2022, 6:31 am by Don Asher
It is rare to find an industry in our part of the country that does not need powered machines in some capacity: from our ports, our air and train transportation, our automotive industry, to our steel mills, our farming operations, our construction projects, and commercial trucking, they are commonplace. [read post]
19 Jul 2021, 6:00 am by Law Offices of Thomas L. Gallivan, PLLC
The DOB categorized this incident as a “Material Failure” and found that it was caused in part by a failure to brace the deck, a lack of oversight, a failure to follow Special Inspector instructions, “lack of knowledge surrounding the requirements of cold-form steel construction and lack of bracing of the cold-form steel. [read post]
24 Aug 2012, 1:15 pm
The Company’s foreman ordered planks to be brought from the first floor of the building under construction down to the C-3 level and placed side by side across steel beams. [read post]
9 Jul 2024, 9:08 pm by News Desk
“The presence of this dangerous bacteria at a cheese manufacturing facility in Upstate New York is of grave concern,” said Grant C. [read post]
25 Aug 2019, 9:03 pm by News Desk
“One environmental swab was collected from a peeling room floor drain,” and, “One environmental swab was collected from the egg counter entrance and stainless-steel area at the end of the conveyor belt,” which is a food contact surface. [read post]